A water tank is an odd purchase. You buy it once, it is heavy enough to need a crane, and after installation you rarely think about it unless something goes wrong. That means the decisions you make before the crane arrives carry most of the weight. This guide takes them in order, so that by the end you can ask for a written quote knowing what you want and why.
What a concrete water tank actually is
Strip away the sales language and a concrete water tank is a reinforced concrete box with a waterproofing system. Each part has a specific job. Concrete is strong in compression. Steel reinforcement deals with tension, which is what a full tank puts into its walls as water pushes outward. Underground, the soil pushes back inward when the tank is empty or low, so the structure has to cope with loads in both directions over its working life.
Concrete alone is not a water barrier. It is slightly porous, and water will find any fine crack or weak joint. So a sound tank depends on the structure and the waterproofing working together. When someone tells you concrete tanks leak, the story usually comes down to a failure in one of those two things.
Our tanks at Concrete Tank are precast reinforced concrete, cast and cured in our factory in the Al Suwaidi district of Riyadh under engineering supervision, then delivered by truck and placed by crane. The page on precast concrete tanks goes further into how that works.
Where concrete makes sense, and where it does not
Plastic and fibreglass tanks are lighter and easier to lift onto a roof, and for small volumes that can be exactly what you need. Concrete starts to win once you want serious storage at ground level or below it. A thin-walled tank on a roof in a Saudi summer heats up quickly. A thick concrete wall responds far more slowly to the weather, especially with soil around it.
The trade-off is weight and access. You need a truck, a crane and a fixed position, and once placed the tank stays where it is. If you are weighing the materials against each other, read concrete vs plastic and concrete vs fibreglass before going any further.
Types of concrete water tank
The word "type" gets used for several different things. It helps to separate them, because each one answers its own question.
- How it is made. Precast tanks come finished from a factory. Cast-on-site tanks are formed and poured where they will stand.
- Where it sits. An underground tank goes into a pit. An above-ground tank stands on a base.
- Its footprint. Long and narrow for side passages, square for corners and yards, wider where you have room and want the volume.
- What it serves. A villa tank is mostly a question of placement. A building tank is a question of headcount and pumping. A farm tank is a question of wells, trucks and long pipe runs.
The seven sizes we make
Here is the full range, with footprints worked out so you can pace them out on your own plot.
| Tank | L × W × H (m) | Footprint | Worth noting |
|---|---|---|---|
| 14 m³ | 3.55 × 2.30 × 2.80 | 8.2 m² | Narrowest and lowest in the range |
| 22 m³ long | 3.70 × 2.70 × 3.30 | 10.0 m² | Suits a run along a boundary wall |
| 22 m³ square | 3.30 × 3.30 × 3.00 | 10.9 m² | Same volume, 30 cm lower than the long one |
| 24 m³ | 4.40 × 2.90 × 2.90 | 12.8 m² | Same footprint as the 29 m³ wide |
| 28 m³ | 4.35 × 3.35 × 2.90 | 14.6 m² | Most volume at the lower height |
| 29 m³ long | 5.00 × 2.50 × 3.30 | 12.5 m² | Largest volume on a 2.5 m width |
| 29 m³ wide | 4.40 × 2.90 × 3.30 | 12.8 m² | 40 cm taller than the 24 m³ for 5 m³ more |
A few comparisons are easy to miss. If height is not a constraint, the 29 m³ wide gives you 5 m³ more than the 24 m³ without taking another square centimetre of ground. If height is your limit, the 28 m³ at 2.90 m is the one to look at, provided you can spare the extra width. And if your only available spot is a strip beside a wall, the 29 m³ long is narrower than either 22 m³ option, as long as you have five clear metres.
Sizing the sum and the judgement call
The sum is people multiplied by daily use multiplied by days of cover. We use 250 litres per person per day as an average household figure. Use 180 for a light-use home and 350 if you have gardens to water, frequent guests or lots of washing. The tank calculator does this for you.
Try it with a household of eight wanting a week of cover. At 250 litres that is 14,000 litres, or exactly 14 m³. At 350 litres it becomes 19,600 litres, and the right answer moves up to 22 m³. Same family, different habits, a different tank. This is why copying your neighbour's choice is a poor method.
Here is how long each capacity lasts from full at 250 litres per person per day.
| Capacity | 6 people | 8 people | 10 people | 12 people |
|---|---|---|---|---|
| 14 m³ | 9.3 days | 7 days | 5.6 days | 4.7 days |
| 22 m³ | 14.7 days | 11 days | 8.8 days | 7.3 days |
| 24 m³ | 16 days | 12 days | 9.6 days | 8 days |
| 28 m³ | 18.7 days | 14 days | 11.2 days | 9.3 days |
| 29 m³ | 19.3 days | 14.5 days | 11.6 days | 9.7 days |
How many days do you really need?
People count is a fact. Days of cover is a judgement, and it depends on your street more than your house. How reliable is your mains supply? When it goes off, how long does it stay off? If you rely on water trucks, do they come the same day in August? A home on a steady network can carry less reserve than one that lives on deliveries.
Truck load matters too. Ask your usual driver what the truck carries and compare that with your tank. You want to be able to take a full load with room to spare rather than paying for water you cannot accept. There is more on this in our guide to filling from a water truck.
Buildings and larger projects
For apartment buildings, count people rather than flats. Eight flats with five people each is 40 people, or 10 m³ a day at the average figure, so a single 29 m³ tank gives just under three days. Twelve flats pushes daily use to 15 m³ and the same tank gives under two days. At that point most owners look at two connected tanks. A pair of 29 m³ tanks holds 58 m³, close to four days.
Two tanks have a benefit beyond volume. With isolating valves you can empty, clean or inspect one while the other keeps the building supplied, which matters when tenants will call you the moment the taps stop. Our building water storage guide covers this in more depth. Farms need a different calculation altogether, based on irrigation and livestock, so see the farm water storage guide.
Waterproofing the part you will never see again
Once an underground tank is backfilled, its outer coating is out of reach for good, at least without digging the whole thing out. So this is the moment to be demanding. Ask specific questions now, because later you will have to trust the answers.
Our tanks have two layers.
- A water-safe chemical lining inside, which seals the concrete on the side that faces the stored water.
- Bitumen outside, which keeps soil moisture away from the body of the concrete. This is especially important underground.
Two layers are needed because the threat comes from two sides. Stored water presses to get out. Damp soil, salts and in some places groundwater press to get in. An uncoated outer face in wet, salty ground leaves the concrete exposed to that attack for as long as the tank is in the ground. Read more in our piece on bitumen and tank waterproofing.
Questions worth asking any supplier
- What exactly is applied inside and what is applied outside? "Waterproofed" on its own tells you nothing.
- Is the waterproofing written into the quote?
- Does the warranty cover leaks and cracks, or only the structure?
- Who repairs the coating if it gets scraped during placing or backfilling?
Our warranty runs for 10 years on manufacturing and installation and covers cracks and leaks. Whoever you buy from, get that scope in writing. You can read the rest of our position on the why choose us page.
Underground or above ground
The same tank does both, so the question is really about your plot and how you live on it.
| Factor | Underground | Above ground on a base |
|---|---|---|
| Yard space | Ground above can often be reused, depending on design | Takes its full footprint |
| Appearance | Out of sight | A 3 m concrete block, often above wall height |
| Filling from a truck | Easy, the water runs down | Inlet is high, so plan it with your truck supplier |
| Work beforehand | Excavation, base, then backfill | A level, strong base |
| Summer heat | Soil shields the tank | More exposed to sun |
| Finding a leak | Harder, the walls are buried | Easier, you can walk around it |
Go underground if you are still building, if digging is straightforward, if you want the yard back or if you simply do not want to look at a concrete block. In the inland summer, the heat alone persuades many owners.
Go above ground if the ground is hard rock, if the water table is close to the surface or if your yard is already finished and you would rather not break it up. Think hard about the base, though. 29 m³ of water weighs about 29 tonnes before you add the tank itself. That is why these tanks stand on a solid base at ground level and do not belong on a house roof.
When groundwater changes the answer
Near the coast and on salt flats, groundwater can sit close to the surface. It pushes on an underground tank from all sides, including from below, and an empty tank in saturated ground can be pushed upward. So high groundwater does not only affect the waterproofing. It also affects how you empty the tank for cleaning. Read tanks in high groundwater if there is any chance this applies, and underground vs above ground for the full comparison.
Precast or cast on site
This is the decision people often skip, because a local contractor offers to build a tank on site and it sounds simple. Both methods can work, and each suits different situations.
| Factor | Precast | Cast on site |
|---|---|---|
| Where it is poured and cured | Factory, under engineering supervision | On your plot, in your weather |
| Time on site | Usually one installation day once ready | Stages spread over a much longer period |
| Disruption | Limited to the delivery day and groundwork | Rebar, formwork, mixers and crews on site |
| Sizes | Set range | Any shape you can build |
| Construction joints | Fewer site joints to worry about | Joints between pours need real care |
| Access needed | Truck and crane must reach | Possible where a crane cannot reach |
The difficulty with site casting in Saudi Arabia is mostly the climate and the supervision. Concrete poured in high heat loses water quickly, and curing needs someone to keep at it long after the crew has moved on. In a factory those steps are the daily routine, not an exception that depends on one foreman on one hot afternoon.
Site casting is still the honest answer in some cases, such as a basement or a courtyard no crane can reach, or a shape that neither a standard size nor a set of connected tanks can provide. For the longer argument, read precast vs cast in place.
Getting the site ready
Installation usually takes one day, but only if the site is ready when the truck pulls up. Most lost installation days come from a pit that is not quite finished. Here is what finished means.
For an underground tank
- Confirm your tank size before anyone starts digging.
- Dig larger than the tank on all sides, so it can go down without scraping the walls and there is room to backfill properly.
- Allow for the tank height plus the base. Our tanks range from 2.80 m to 3.30 m high.
- Build a level, solid base. The tank should not rest on loose soil.
- Pump out any water that has collected in the pit before delivery day.
- Make the sides safe if the soil is prone to collapse, and keep people out of the pit until it is.
For an above-ground tank
- Build a base larger than the footprint and strong enough for the full weight of tank and water.
- Check it is level across its whole area. A slope stresses the tank and throws off your pipework.
- Leave enough space around the tank to get to it for inspection and maintenance.
- Decide where overflow water goes. It should not run against the wall of your house.
Whichever you choose, plan the pipe routes now. Where the water enters and leaves determines where the pump sits and where the truck parks. If you are torn between two spots on a villa plot, villa tank placement will help. The site preparation guide has the full checklist. And if you are unsure about anything, send us photos on WhatsApp before you pay for excavation.
Delivery day truck and crane
Two questions decide whether delivery day goes smoothly. Can the truck get there? And can the crane stand close enough to reach the spot? The easiest way to find out is to walk the route yourself from the nearest main road and look for these things.
- Road width and turns. A long truck cannot get around every corner in an older neighbourhood.
- Overhead cables. Look along the road and over the plot. The crane jib swings above you, and this is the first safety question.
- Crane standing ground. It needs firm, stable ground. Be wary of freshly dug or backfilled soil, and of septic pits nearby.
- Reach. The further the crane stands from the pit or base, the harder the lift becomes.
- Obstacles in the air. Walls, canopies, trees and anything else in the path of a suspended tank.
- Parked cars. Warn your neighbours the day before that the street needs to be clear.
Photograph all of it and send it over with your request. Far better to discover a low cable from a photo than on the morning itself. Our article on crane and delivery access goes through each point.
Delivery and installation are free inside Riyadh. Other cities have a fee based on tank size and distance, and all regions are served. The areas page lists the cities with their own local notes.
Connections getting water in and out
Each tank has inlet and outlet openings that connect to mains, a water truck, a well or a pump. Think of your plumbing as two separate routes, and plan each with your plumber before the tank arrives.
The route in
- Mains. A pipe from the meter to the inlet with a float valve that shuts when the tank is full. A stuck float valve is a classic source of wasted water.
- Water truck. A filling point the driver can reach from the street without entering your yard.
- Well. The well pump feeds the tank. If your well brings sand or sediment, deal with that upstream so it does not settle at the bottom of the tank.
The route out
An underground tank will not deliver water to your house without help. A pump lifts water to a roof tank or feeds the internal network directly. The choice depends on building height and the number of outlets, and our tank pump guide walks through it. In an apartment building, think about what happens when your only pump fails on a Friday night, so a standby pump is worth planning for.
Fit isolating valves so you can shut off the tank without shutting off the house, and give each tank its own valve if you have connected a pair. Pipes entering an underground tank pass through backfill, so ask your plumber to allow for settlement. The details are in tank plumbing connections.
Cleaning and everyday care
You will see tables online claiming a tank must be cleaned at a fixed interval. There is no single right answer. Water from a mains network behaves differently from truck water or well water, which can bring sediment with every load. A better habit is to set yourself a regular date to open the tank and look. Sediment on the floor or a change in the look of the water means it is time.
A sensible cleaning routine
- Run the level down through normal use, then pump out the rest. If you are in high-groundwater ground, check it is safe to empty the tank first.
- Open the cover and let fresh air circulate before anyone enters. A tank is a confined space, so nobody should go in alone.
- Remove the sediment and wash the walls with a soft brush.
- Avoid abrasive tools and harsh products that can damage the internal lining.
- Rinse and pump out all the rinse water.
- While you are inside, check the walls, openings and float valve, then close the cover firmly.
If you hire a cleaning company, tell them the tank has a chemical lining and ask how they plan to protect it. See the tank cleaning guide for more.
The everyday habits matter more than the occasional deep clean. Keep the cover properly closed so dust and insects stay out. Keep rainwater and irrigation runoff from pooling around the openings. Do not store things on an above-ground tank or lean materials against it. Our notes on keeping tank water clean cover the rest.
Warning signs and what to do about them
Tanks rarely fail suddenly. They usually give you a hint first, and you will catch it if you know what to look for.
| What you notice | Likely cause | First step |
|---|---|---|
| Level falls with nothing in use | Leak in tank or pipework | Do the level test below |
| Pump cuts in while everyone is asleep | Leak after the tank, or a faulty float valve | Check float valve and house plumbing |
| Sudden jump in your water bill | Float valve not closing, or a supply-side leak | Watch the meter with everything off |
| Damp patches on walls or nearby ground | Tank or pipe leak | Trace the source before repairing anything |
| A crack that grows | Structural or base movement | Photograph and measure it, then ask for an inspection |
| Ground sinking around the tank | Poor backfill or an underground leak | Keep vehicles off and get it inspected |
| Sediment, colour or smell in the water | Source water, or a tank overdue for cleaning | Open the tank, clean it and review the source |
The level test
Shut off the inlet and outlet. Mark the water level on the wall or a stick. Come back many hours later with nothing used. If the level dropped, look at the tank and its openings. If the level held but the meter is still turning, look at the supply pipework instead. It is a simple test, and it tells you where to start. Tank leak detection goes further if the result is unclear.
If you own an older tank with a repeat problem, there comes a point where another repair is not the sensible choice. Signs a tank needs replacing helps you judge when that is.
How your region changes the plan
A plan that works on firm inland ground can need rethinking on a damp coast. Treat these as starting points. Each city has its own page with more detail.
- The east. In Dammam, Jubail and Al Ahsa, humidity and shallow groundwater come first, so the outer waterproofing does serious work.
- The west coast. In Jeddah, Yanbu and Jazan, check for water in a trial pit before committing to an underground tank.
- The centre. Around Qassim and Al Kharj, farm use and well connections come up constantly, and in the capital the summer heat pushes many owners underground.
- Makkah and Madinah. Much of the ground around Makkah and Madinah is rocky, so if digging proves hard on your plot, an above-ground tank is a serious option.
- The south. Around Najran, valley farms mean well connections and long pipe runs need early planning.
- The mountains. In Abha and Taif, steep roads and sloping plots make crane access the first thing to check.
- The north. Tabuk, Hail and Al Jouf are a long haul from the factory, so an exact location and early planning help with your delivery date.
How to get a quote
Send your location and some site photos on WhatsApp, and we reply with a quote and a date. The quote is free and written, VAT is shown separately, and you receive an official tax invoice. The more you include, the more accurate the first reply will be.
- Your location pin, wherever you are in the Kingdom.
- Photos of the tank spot from a few angles.
- Photos of the street, gate and any overhead cables, so we can judge crane access.
- The size you want, or the number of people if you have not decided.
- Underground or above ground, and whether the pit or base exists yet.
- Your water source, such as mains, truck or well.
- The number of tanks, if this is a project.
Comparing quotes fairly
Do not compare headline figures alone. Compare the size, the waterproofing layers, whether delivery and installation are included, and what the warranty covers and for how long. A vague quote can look like the better deal until the extras start to appear. Our buying checklist gives you the questions to put to every supplier.
Contractors and developers can ask for a special quote covering multiple tanks, including installing and connecting them. If something here is still unclear, try the FAQ, read about us, browse the blog or simply contact us with your site photos and we will help you choose.