Concrete Water Tanks for Apartment Buildings & Compounds

A building needs a large, reliable water reserve for every unit. We supply high-capacity tanks and can install several connected tanks.

How much capacity does a building need?

Residents × 250 litres × days of storage. Example 8 apartments × 5 people = 40 residents ≈ 10 m³ a day, so a 29 m³ tank covers about 3 days. For longer storage we install two or more tanks.

Why several tanks instead of one huge tank?

  • Clean or service one tank while the other keeps supplying residents.
  • Easier installation in limited space.
  • Add capacity later by adding a tank.

For owners and contractors

We offer special pricing for multiple tanks and projects, with official VAT invoices. Send us the number of units and we will prepare a quote.

Recommended sizes

28m³
Buildings & farms

28 m³ Concrete Tank

Suits apartment buildings, large villas, farms and shops

  • Length4.35 m
  • Width3.35 m
  • Height2.90 m

Free quote including delivery to your city

A Practical Guide to Concrete Water Tanks for Buildings and Compounds

Storage by number of apartments

The first thing a building owner wants to know is how many tanks it takes. This table gives a fast answer, assuming five people per apartment at 250 litres each per day. The last three columns show how many days the stored water lasts.

ApartmentsResidentsDaily useOne 29 m³Two 29 m³Three 29 m³
6307.5 m³3.9 days7.7 days11.6 days
105012.5 m³2.3 days4.6 days7 days
126015 m³1.9 days3.9 days5.8 days
168020 m³1.5 days2.9 days4.4 days
2010025 m³1.2 days2.3 days3.5 days
2412030 m³1 day1.9 days2.9 days

What jumps out is how quickly a building drains its reserve compared with a villa. From about 12 apartments up, a single tank leaves you depending on the mains or a water truck almost daily. That is why it pays to think of storage as a system rather than one object. Put your own numbers through the size calculator, and read our building water storage guide for the wider picture.

The decision the table leaves you with is how long you want to hold out. If your district's mains are steady and cuts are rare, two or three days is a reasonable margin. On water trucks, look at it differently. A 20-apartment building uses 25 m³ a day, or 750 m³ a month, all of it passing through your filling point. Each added tank eases the daily pressure on whoever manages the building, and the water truck filling guide is worth reading first.

Your real occupancy may look nothing like the average

Five people per unit is only a starting point. Before you trust any table, think about who actually lives or works in the building.

  • Large family apartments. Use six or seven people if that is normal for the neighbourhood. Twelve apartments at seven people each comes to 21 m³ a day rather than 15.
  • Studios and small flats. Perhaps two people per unit. Twenty units means 40 residents and 10 m³ a day, so one 29 m³ tank lasts close to 3 days despite the high unit count.
  • Furnished apartments and hotels. Laundry and housekeeping push use up, so calculate at 350 litres. Twenty units with three guests each use 21 m³ a day, and a 29 m³ tank lasts under a day and a half.
  • Staff housing. Use per person is lighter but numbers are high. Sixty workers at 180 litres need 10.8 m³ a day, so 29 m³ gives them a little under 3 days.
  • Ground floor shops. A laundry or restaurant uses far more than a clothes shop. Work these out as their own line.

Seasons matter too. Hotels in Makkah and Madinah can fill completely during Hajj and Umrah peaks, so size for full occupancy rather than the yearly average. Workforce housing in Jubail and Yanbu tends to run steadily all year with known headcounts, which makes the sum much simpler.

Choosing between the 28 m³ and the two 29 m³ shapes

The capacity difference between these three is small, so shape and fit should drive your choice.

TankL × W × HFootprintm³ per m² of ground
28 m³4.35 × 3.35 × 2.90 m14.6 m²1.9
29 m³ long5.00 × 2.50 × 3.30 m12.5 m²2.3
29 m³ wide4.40 × 2.90 × 3.30 m12.8 m²2.3
  • The long 29 m³ is built for a narrow side setback. At 2.50 metres it is the slimmest of the three, and two in a line run 10 metres.
  • The wide 29 m³ works in a front or rear setback where you have width but limited length, being 60 cm shorter than the long version.
  • The 28 m³ stands 40 cm lower than both. That helps above ground under a height limit, or below ground on rocky plots where every extra bit of depth is hard won. In exchange it takes roughly 2 m² more ground.

When you need more than one, total ground area becomes the real question. The layouts below show tanks touching, with no gap for pipework, so add whatever spacing your plumber asks for.

LayoutTotal capacityFootprintSide by side
Two 28 m³56 m³29.1 m²4.35 × 6.70 m
Two 29 m³ long58 m³25 m²5.00 × 5.00 m
Two 29 m³ wide58 m³25.5 m²4.40 × 5.80 m
Three 29 m³ long87 m³37.5 m²5.00 × 7.50 m
Three 29 m³ wide87 m³38.3 m²4.40 × 8.70 m

Notice that two long tanks make a near-perfect 5 by 5 metre block, handy for a rear parking corner, yet the same pair can run in a line down a side setback at 10 metres by 2.50. Identical storage can take very different shapes depending on your plot.

If you only need a little more capacity to finish the job, a 24 m³ or square 22 m³ can fill the last gap. All seven sizes are side by side on our tanks page.

How connected tanks should be set up

Once you have two or more tanks, how they are joined decides how easy the next several years will be. The usual layout places them side by side and shares water between them one filling line feeding all tanks, one draw line to the pump room, and a valve on each tank to isolate it from the rest.

Those isolating valves are the entire point. When one tank needs cleaning, you close it, empty it and carry on supplying residents from the others. Without them, you are shutting down the building for one tank's sake. Ask for them at design stage, and see tank plumbing connections for the details.

A few more things to settle while drawing the system

  • Leave enough room between tanks for pipework and for someone to reach the openings. Packing them tight saves ground now and costs you later.
  • Try to use tanks of the same height so water levels stay even. A 28 m³ next to a wide 29 m³ differ by 40 cm, which your plumber should review.
  • Place the truck filling point where a tanker can reach it without blocking residents' parking.
  • If the pump room is a long way from the tanks, that distance and the building height both feed into pump selection. Our tank pump guide explains why.

Be clear in your request about what you want from us and what falls to the project plumber, so the scope is plain in the quote from the start.

Underground storage and roof tanks do different jobs

There is a common mix-up here. The ground-level or buried tank is your reserve against supply cuts. Roof tanks and pumps deal with the morning and evening peaks when everyone opens a tap at once. A bigger ground tank will not fix weak pressure on the top floor, because that is a pump and distribution problem.

Buildings usually bury their tanks because the land above is worth keeping, often as parking. Our underground water tank page covers that route. On the coast and in low areas such as Jeddah, Dammam and Al Ahsa, check the groundwater level before fixing your excavation depth, and read about high groundwater. Every tank we make carries two waterproofing layers, a water-safe chemical lining inside and bitumen outside, and the bitumen article explains the outer layer.

Above ground on a base is easier to inspect and maintain, but it takes space from setbacks and parking. It suits compounds with a dedicated services yard. For the wider comparison, see underground versus above ground.

Fitting the tank into a contractor's programme

For a contractor, the main appeal of a precast tank is that it becomes a dated line item rather than an open-ended site activity. It is cast and cured in our Riyadh factory under engineering supervision and arrives ready, so you carry no formwork, pour or waiting on site. The trade-offs are set out in precast versus cast in place.

A sensible order of work avoids most of the usual headaches

  1. Fix the tank positions on the drawings before pouring neighbouring foundations.
  2. Reserve a route and standing area for the crane, and leave the lifting side unbuilt until the tank is down.
  3. Prepare the pit or base to the tank's dimensions, following our notes on site preparation.
  4. Run filling and draw lines toward the openings before backfilling.
  5. Hand the owner the tax invoice and warranty terms in the project file.

Tight sites need extra thought. In a busy district the truck and crane will take up part of the street, so check our crane access guide and send photos of the road before we fix a date. Installation usually takes one day once the site is ready, and for multiple tanks we set out the schedule with you when we quote.

Replacing a tank in an occupied building

The hardest case is an older building with a leaking cast-in-place tank and residents who cannot go without water for more than a few hours. Confirm the problem first using our leak detection guide and the signs a tank needs replacing.

The practical plan goes like this. Find a new position in a setback or parking area that does not disturb the old tank. Install the new tank there and fill it. Run the draw line from it to the pump room. Switch residents over at a quiet time with everyone ready, and only then shut off the old one. The old tank keeps working throughout the preparation. Keep it full until you are confident in the new one, so you have a way back. Afterwards, build the habits in keeping tank water clean into your building routine.

If the only option is reusing the existing pit, things get harder. You need a temporary water source for residents, accurate measurements of the pit before ordering, and plenty of notice to tenants about the date. Tell us the situation and send photos so we can quote for what you are actually facing.

Owners, tenants and compounds who shares which water

Not every building should have one shared reserve. Three setups deserve thought before you order.

The family building. The owner lives on one floor and rents out the rest, and many owners prefer to keep supplies apart. A 14 m³ tank for the owner's apartment gives six people about 9 days, and a 29 m³ tank serves the tenants. Each side's use stays visible. On the owner's side, the thinking is much the same as for villa tanks.

Tenants paying for their own trucks. Where tenants are charged for water deliveries, one tank per group of apartments cuts down on disputes, though it adds tanks and uses more ground. Work out the space before committing. The right answer depends on your tenancy arrangements more than on the tank.

Compounds. There are two ways to go. Central tanks in one services yard with a distribution network make truck filling and maintenance simple. A tank for each building means a fault in one block leaves the others untouched. Send us the site plan and we can talk through what suits it.

For sites in hilly areas such as Abha or Taif, the slope may help, since a higher tank can feed lower buildings by gravity, but it complicates crane access. Good photos of the site really count here.

Mistakes that prove expensive for building owners

  • Sizing on apartments instead of people. Ten studios are not ten family apartments.
  • Leaving the tank until the end. Once the structure and walls are up, the crane may have no easy way in.
  • A single tank with no backup. Any cleaning or repair means stopping water to every resident.
  • A truck inlet the truck cannot reach. Your building depends on that point whenever the mains cut out.
  • No cleaning plan from day one. An occupied building cannot improvise this. Read the water tank cleaning guide and agree a routine with residents.
  • Buying without comparing written quotes. Take our buying checklist and compare like with like.
  • An opening under a used parking bay. If a car sits on the hatch every day, inspection and cleaning become a dispute with a resident. Keep openings where nobody parks.
  • Forgetting the overflow. Know where water goes if a float fails. A flood near the pump room or basement can do serious damage.

For a general overview of the product itself, the concrete water tank guide covers the basics that help you compare any offer.

Getting a quote for a building or project, anywhere in the Kingdom

We supply buildings and compounds across Saudi Arabia, from Riyadh to Tabuk and Jazan. Delivery and installation are free inside Riyadh, and elsewhere there is a fee based on size and distance. Multiple tanks and projects get a special quote.

Send us these details on WhatsApp and we will come back with a quote and a date

  1. Project location on the map, with photos of the plot and street.
  2. Number of apartments, type of housing and expected residents.
  3. How many days of storage you want.
  4. A site plan if you have one, marking the proposed tank positions.
  5. The project stage, and whether the building is new or occupied.
  6. Underground or above ground.

The quote is free and written, with VAT shown separately, and you receive an official tax invoice for your project accounts. The 10-year warranty covers manufacturing and installation, including cracks and leaks. Learn more about us and why owners choose us, or get in touch now.

FAQ

How many tanks does a 12-apartment building need?
At five people per apartment it uses 15 m³ a day. Two 29 m³ tanks cover about 4 days and three cover about 6. The decision comes down to how long you want to hold out if the mains stop.
Can a new tank be connected to an existing one?
The connection itself is possible, but check the old tank's condition first. Linking sound storage to a leaking tank just shares the problem. Each tank should have its own isolating valve either way.
Can we mix different sizes in one system?
Yes, and sometimes the space forces it. Different heights do affect water levels between tanks, so have the project plumber review the connection method before ordering.
How do we handle water on installation day in an occupied building?
If the new tank has its own position, residents are not affected during installation. The short interruption comes when lines are switched over, so warn residents and schedule that step for a quiet time.
Can you quote a subcontractor on a large project?
We work with owners and contractors, and can address the quote to whichever party is contracting with us. Send the location, number of tanks and project schedule.
Is a concrete tank a good fit before backfilling on a new building?
Yes, this is the easiest moment because the site is still open. Have the pit or base ready and a clear route for the crane. Fix the position on the drawings and book the date ahead of backfilling around the tank.
Do you offer contractor pricing?
Yes, for multiple tanks and projects we provide a special quote. Send us your project details on WhatsApp.
What does the warranty cover?
A 10-year warranty on manufacturing and installation, covering cracks and leaks.
How long does installation take?
The tank arrives ready-made from the factory; crane installation usually takes one day once the site is prepared. We agree the delivery date when you order.