If your plot is on damp ground, you have probably heard two opposite opinions. One person says an underground tank is impossible there, and another says to dig and drop it in. Neither is quite right. A waterproofed concrete tank handles moisture well, but groundwater brings two problems that waterproofing alone cannot solve a difficult excavation and base, and an upward force that can move an empty tank.
This guide walks you through it in order. You will learn how to read your site, when an underground water tank makes sense and when to go above ground, and how to dig and run the tank without nasty surprises.
What does high groundwater actually mean?
Under any plot there is a level where the soil becomes saturated. If that level is far down, your tank never meets it. If it is close, the tank will sit partly or wholly in wet ground. Our tanks stand 2.80 to 3.30 m tall, so a fully buried one needs a pit around that deep, plus the base. Water at that depth concerns you directly.
It is worth working out which of three situations you are dealing with
- Natural shallow groundwater. Common along the coasts, near salt flats and in farming oases.
- Trapped or leaked water. Garden irrigation, leaking networks and nearby drainage can raise water in neighbourhoods that were never naturally damp.
- Seasonal saturation. The ground stays dry for most of the year and fills up after rain or when a wadi runs.
The third one catches people out. You dig in summer, the pit is dry, and you relax. Then the rainy season changes everything. A single digging day does not tell you how the site behaves all year.
Where damp ground and shallow groundwater show up in Saudi Arabia
Your region gives you a hint, but only your own plot gives you an answer. Two plots in one neighbourhood can differ.
- The east coast. In Dammam, Khobar and Qatif and in Jubail, groundwater can be shallow and salty, particularly on land close to the sea and salt flats.
- The Al Ahsa oasis. Farms, springs and irrigation in Al Ahsa keep the soil damp on many plots, especially near cultivated land.
- The west coast. Jeddah and Yanbu combine humid air with salty soil, and low-lying plots near the shore deserve a closer look.
- Jazan and the Tihama. Jazan is coastal, humid for most of the year, and has salt flat ground in places.
- Wadis and the mountains. Around Abha and Taif, ground can become saturated after seasonal rain depending on where you sit relative to the wadi.
- Inland cities. Even in Riyadh, Qassim and Al Kharj, heavy irrigation, leaks or a nearby wadi can leave a particular plot wet.
How to check your groundwater before you dig
You do not have to begin with the full tank pit. These steps run from the easiest to the most reliable.
- Ask the neighbours and whoever built nearby. Did they hit water digging foundations, and how deep? This is free and surprisingly useful.
- Check any soil report. If you are building, the soil was probably investigated. The report should say whether water appeared in the boreholes and at what depth. If you do not have one, ask your project engineer.
- Read the ground. White salt crusts, soft soil, grass growing without irrigation and damp at the foot of nearby walls are all signs worth following up.
- Dig a test pit. Excavate a small hole at the tank location, close to the tank's depth, then leave it and come back. If water collects, measure its depth from the surface. A pit that has sat for a while tells you far more than one you glance at while digging.
- Repeat in another season if you can, especially near a wadi or in a rainy area.
Before any digging, confirm the spot is clear of drainage, electrical and water lines. Excavating near a building's foundations in wet ground also calls for an engineer's opinion, because saturated soil behaves differently from dry soil.
Uplift the force that matters more than moisture
This is the part many people never hear about. An empty tank in water behaves like a boat. The water pushes it upward with a force about equal to the weight of the water it displaces, and each cubic metre displaced means roughly one tonne of upward push.
The arithmetic is simple multiply the tank's footprint by the height of water around it. This table shows the push for every metre of groundwater around the tank, based on the outer dimensions.
| Tank size | Footprint | Approx. uplift per metre of water |
|---|---|---|
| 14 m³ | 8.17 m² | 8 tonnes |
| 22 m³ long | 9.99 m² | 10 tonnes |
| 22 m³ square | 10.89 m² | 11 tonnes |
| 24 m³ | 12.76 m² | 13 tonnes |
| 28 m³ | 14.57 m² | 15 tonnes |
| 29 m³ long | 12.50 m² | 12.5 tonnes |
| 29 m³ wide | 12.76 m² | 13 tonnes |
So if groundwater rises two metres around a 24 m³ tank, the upward push reaches about 26 tonnes. Working against it are the weight of the concrete, the soil on top and the water inside, and every cubic metre of stored water adds about a tonne of downward weight.
The practical lesson is clear. A full tank in wet ground will generally stay put, and an empty one is the tank at risk. There are three sensitive moments before the first fill, while you have emptied it for cleaning, and during long idle periods on a seasonal site such as some farms. Working out the exact balance for your plot is an engineer's job, so ask for it if water really does reach the tank's depth.
Buried or above ground making the call
No single answer fits every plot, but this table will get you close. For the general comparison, see underground vs above-ground tanks.
| Site condition | Likely choice | What to do |
|---|---|---|
| Damp soil, no standing water | Underground | Clean pit, clean backfill, and surface water directed away |
| Water well below the pit floor | Usually underground | Considered base design, then watch levels after rain |
| Water within the tank's depth | Ask an engineer | Check uplift and plan water removal before digging |
| Water very close to the surface | Above ground on a base | Shade, a suitable pump and a safe location |
| Sewage or septic system nearby | Move the tank | Keep the tank as far from drainage as you practically can |
An above-ground tank on a base removes the digging, the dewatering and the uplift all at once. The trade-off is a visible structure that gets more sun. Our smallest, the 14 m³ tank, needs 3.55 by 2.30 m and stands 2.80 m tall, so check your courtyard first with our villa tank placement guide.
Some owners choose a middle route and partly bury the tank. It cuts digging depth and reduces contact with water, though crane access, the position of the openings and the look of the site all need thought.
Preparing the pit in wet ground
The basics in our site preparation guide still apply, but damp ground adds a few extra points to get right.
- Plan your dewatering before you dig. If you expect water, arrange a pump and somewhere to discharge it. Do not send it onto a neighbour's land or next to a building's foundations.
- Take the pit sides seriously. Saturated soil can collapse quickly. Nobody should work in a deep pit with unsupported sides, and spoil should not be piled on the edge.
- Do not pour a base into standing water. Pump out first and set the base as your site engineer directs. A gravel layer beneath it helps drainage during the works on many sites.
- Time the pit to the delivery. A wet pit will not wait for you. Have it ready as close to truck arrival as possible and keep pumping until the tank is down and backfilled.
- Check the ground for machinery. Soft ground may not carry a crane and truck close to the pit. Go through our crane and truck access notes and agree a firm standing area.
- Fill the tank after installation. Do not leave it empty in wet ground, since the weight of the water works in your favour.
Backfill matters too. Use clean material without sharp stones that could strip the bitumen, and keep surface water from pooling on top. Before anything gets covered, look over the weak points listed in our guide to tank waterproofing with bitumen.
What waterproofing can and cannot do here
Our tanks come with bitumen outside and a water-safe chemical lining inside. That protects concrete and steel from moisture and salts on ground like the Eastern Province or Jazan. Be clear about its limits, though.
- It can separate the concrete from ground moisture and protect it over time.
- It cannot stop uplift, which is a matter of weight and not a leak.
- It cannot make up for a poor excavation or a scratch left unrepaired before backfilling.
- It cannot help with a loose opening or a hatch sitting below the water level.
Openings and connections on a wet site
On damp sites, water tends to get in from above or around the edges, and rarely through the wall itself. Treat these as fixed rules.
- The inspection hatch sits above the highest level water could reach, with a tight cover.
- Overflow and vent openings stay out of any spot that could flood or take surface runoff.
- The overflow line discharges well away from the tank and does not drain back around it.
- Pipes entering the tank are sealed and supported so they do not shift if the soil settles.
The pump needs its own thought. In a below-ground room on a wet site it can flood, so raise it or place it where water can drain away. See the tank pump guide and our notes on plumbing connections.
Watching the tank after installation
On a wet site, the water level is the most useful signal you have. These signs deserve attention.
- Level rising without filling. Either a valve is letting water through or water is entering from somewhere.
- Cloudy or salty water. Stop drinking it and investigate at once.
- A hatch that has shifted or a stretched connection. The tank may have moved or the soil may have settled.
- Standing water above or around the tank. Sort out the drainage before it becomes permanent.
The checks themselves are set out in how to tell if a tank is leaking. And before emptying a tank on a wet site, ask where the groundwater is right now. If levels are high after a rainy spell, put off the full drain and wash in stages on your engineer's advice.
Larger projects and farms
Residential projects and building tanks normally have a soil report and a site engineer, so make the tank part of the basement and foundation design from day one, not the last item on the list. The tank should not carry a building's load unless that has been designed for.
Farms are a different case. With more land, you can often pick a higher spot or simply put the tank above ground. Connecting several tanks gives you capacity without any extra depth. Our farm water storage guide goes further.
What to send us if your site is wet
The clearer your information, the more accurate the quote. Send these with your location on WhatsApp.
- Site photos and, if water has appeared, photos of the pit.
- The depth where water appeared and the season it was.
- Your number of people, or the capacity from our tank size calculator.
- Whether you prefer buried or above ground. If you are unsure, say so.
We will reply with a written quote and a date. Our tanks carry a 10-year warranty on manufacturing and installation, covering cracks and leaks, and we install across all regions of the Kingdom, free inside Riyadh and for a fee based on size and distance elsewhere. Feel free to browse the concrete tank sizes first.