Concrete Tank
  1. Home
  2. Precast tanks

Precast

Precast Concrete Water Tanks

Instead of casting a tank on site and waiting weeks for formwork, steel and curing, a precast tank arrives from the factory and is installed in a day.

What is a precast tank?

Precast means the tank is cast and cured in our factory under engineering supervision, then transported ready-made and lowered into place by crane.

Precast vs cast-in-place

Precast tankCast in place
Installed in one dayWeeks of site work
Consistent factory quality, engineer-supervisedDepends on contractor and labour
Clear, fixed priceCosts rise over time
Delivered waterproofedWaterproofing is a separate job
10-year warrantyLimited or no warranty

How is it installed?

You prepare the site (pit or base), we deliver the tank by truck, a crane lowers it into place, then the plumbing is connected. See our site preparation guide.

Recommended sizes

14m³
Compact

14 m³ Concrete Tank

Suits small homes, duplexes and ground-floor apartments

  • Length3.55 m
  • Width2.30 m
  • Height2.80 m

Free quote including delivery to your city

28m³
Buildings & farms

28 m³ Concrete Tank

Suits apartment buildings, large villas, farms and shops

  • Length4.35 m
  • Width3.35 m
  • Height2.90 m

Free quote including delivery to your city

Buying a precast concrete water tank what to know before you order

Who a precast tank really suits

People come to precast for quite different reasons, and your reason decides what you should look at most closely when you order.

The homeowner on a build schedule. You have a contractor, finishing is under way, and the last thing you want is formwork, steel fixers and concrete trucks in the middle of the site. A factory-made tank takes a whole trade off your programme.

The family already living in the house. The old tank has failed or no longer covers your needs, and you would rather not host a building crew at the front door. If a crane can reach the spot, the disruption stays short. If you are not sure the old tank is done yet, read the signs a tank needs replacing.

The farm owner in a remote area. Getting ready-mix, labour and daily supervision out to a distant farm is hard work. A tank that arrives finished skips all those trips. Our page on farm water tanks looks at hooking one up to a well and pump.

The contractor or developer. You want quantities, a written quote and a date early, so the tank can sit on the schedule as one clear line item rather than a run of open-ended site tasks. See building water tanks for how this works on larger jobs.

The villa or palace owner with high demand. Gardens and big majlis areas use a lot of water, and you want volume without a tank spoiling the elevation. Start from the larger sizes, possibly two connected, and see villa water tanks.

What happens at the factory, and why it matters

When you buy precast, you are paying for steps that were finished before you ever see the tank. Understanding those steps tells you what to ask about.

Our tanks are cast in our Al Suwaidi factory in Riyadh under engineering supervision. The real difference from site work is the environment. On an open plot, Saudi sun, dust and wind all get a vote, and the mix may sit waiting while crews change from one day to the next. In a factory, the moulds and method stay the same, and every tank goes through the same sequence.

Curing comes next, and it is the step most easily rushed. Concrete does not gain strength simply by drying out. It needs time while holding on to its moisture, which is difficult to manage on a busy summer site where everyone wants to move on. In the factory, curing is built into the process, and the tank does not leave before it is done.

Last is waterproofing. Each tank gets two layers a water-safe chemical lining inside and bitumen outside. That spares you from hiring a separate waterproofing contractor later, or from watching that job slip behind other trades. Our article on bitumen and tank waterproofing explains how the layers work. The 10-year warranty then covers manufacturing and installation, including cracks and leaks.

What is left for you to do on site

Precast does not mean nothing happens on your side. It means a shorter and clearer list. This table shows what drops off and what stays.

Not needed on your siteStill your responsibility
Timber or steel formworkPreparing the pit or base
Steel fixers and carpentersClearing a route for the truck and crane
Concrete mixers and concrete pumpsSending clear photos of the spot and the street
On-site curing supervisionDeciding the pump location and pipe route
A separate waterproofing contractorThe connections once the tank is down

Notice that most of what remains is planning, not construction. A little planning before the date can save you a stalled installation day. Our site preparation guide takes you through it step by step.

Choosing from seven standard sizes

With precast you pick from fixed sizes instead of drawing your own. That is a benefit as much as a limit, since each size is already worked out and made in the factory. The range runs from 14,000 to 29,000 litres.

SizeLitresL × W × H (m)Often suits
14 m³14,0003.55 × 2.30 × 2.80Smaller homes, limited space
22 m³ long22,0003.70 × 2.70 × 3.30A villa side setback
22 m³ square22,0003.30 × 3.30 × 3.00A yard corner
24 m³24,0004.40 × 2.90 × 2.90Mid-size villas, small buildings
28 m³28,0004.35 × 3.35 × 2.90Wider plots, shallower digs
29 m³ long29,0005.00 × 2.50 × 3.30Narrow strips along a wall
29 m³ wide29,0004.40 × 2.90 × 3.30Palaces and farms needing volume

For a quick estimate, multiply the number of people by 250 litres a day. A family of eight uses about 2,000 litres daily, so a 14 m³ tank lasts 7 days and a 28 m³ tank lasts 14. The calculator lets you try light or high use as well, and the tanks page gathers every size in one place.

Note that the two 29 m³ tanks hold the same water and differ only in shape, and the same goes for the two 22 m³ tanks. So measure your space first, then let the space choose between them.

When precast is not the answer

We would rather tell you this now than on installation day. Some sites really are a poor match for a factory-made tank.

  • No crane route. If the house is on a tight lane or the yard is boxed in on all sides and the crane boom cannot reach, we need to see the site before promising anything.
  • An unusual space. If your drawings have an odd-shaped void and you want the tank to fill all of it, fixed sizes may not fit.
  • A tank inside the structure. When the tank forms part of a basement or carries columns above it, that is a structural design decision for your engineer and the building drawings.
  • Far more than 29 m³ in one spot. Our answer is several connected tanks. If the area can take them, that works very well. If not, you may need a different approach.

Most houses, villas and farms never meet these limits. For the full comparison, see precast vs cast-in-place tanks. If you are weighing materials rather than methods, we also compare concrete and fiberglass and concrete and plastic.

Getting a precast tank to your site

A precast tank is a big, heavy object travelling down a public street, so route planning is part of the job. These are the things we look for in your photos.

  • Can a large truck enter the street and turn around in it?
  • Are there power lines, footbridges or low branches over the route?
  • Where will the crane stand, and is that ground firm rather than soft fill?
  • How far is it from the crane position to the tank position?
  • Does a tall wall or gate stand between them?
  • Will neighbours need to move their cars on the day?

Take pictures from several angles, and include the street as well as the yard. In mountain cities such as Abha and Taif, pay attention to climbs and sharp bends. For outlying farms around Tabuk or Al Jouf, photograph the last stretch of unpaved track, since that is usually what decides things. Our guide to crane and delivery access has more.

If the tank is going above ground, the base deserves the same care as the route. It has to be level and able to carry the full tank. One cubic metre of water weighs about a tonne, so a full 24 m³ tank holds around 24 tonnes of water on top of the concrete itself. Have your site engineer look at it if you have one.

When to order on a project under construction

Timing matters more than people expect. A lot of owners leave the tank until late, then find the boundary wall is finished, the gate is hung, the trees are planted and the crane no longer has a way in.

The smoothest route is to settle the size at drawing stage, mark the location before the wall starts, install before you close the side the crane needs, and have the inlet and outlet pipes ready around the same time. If the wall has to go up early, leave one section open until installation day.

One tip for contractors tie the tank date to pit readiness rather than a date fixed at the start of the job. When the pit is done, send photos and we agree on a day. Installation usually takes one day once the site is ready, so other trades barely lose any time. For a house-focused view of positioning, read where to place a tank at a villa.

Multiple precast tanks for buildings and projects

As demand grows, you do not need an imaginary giant tank. Several tanks can be installed and connected, and simple arithmetic shows how many make sense.

OccupantsDaily use at 250 litresOne 29 m³Two 29 m³
20 people5,000 litresabout 6 daysabout 12 days
40 people10,000 litresabout 3 daysabout 6 days
80 people20,000 litresabout 1.5 daysabout 3 days

Two tanks also give you something one tank cannot. You can take one out of service for cleaning while the other keeps supplying the building, and you can split storage across different parts of a site. Our building water storage guide looks at the whole plan.

When linking tanks, try to keep heights and floor levels close, because connected tanks settle at the same water level. Join a 2.90 m tall 24 m³ to a 3.30 m tall 29 m³ on the same floor and the taller one needs thought in the pipework to use its full height, which is why repeating one size is usually simpler. Fit each tank with its own valve so you can isolate it, and read tank plumbing connections before your plumber starts.

Projects and multi-tank orders get a special quote. Every quote is free and in writing with VAT shown separately, and you receive an official tax invoice, which makes the item easy to add to project files.

Questions to put to any precast tank supplier

Whether you buy from us or someone else, these questions protect you. The word "ready-made" on its own should not reassure anyone.

  1. Where exactly is the tank cast, and can you visit the factory?
  2. What waterproofing goes inside and outside, and is the inner layer water-safe?
  3. Is the warranty in writing, does it include installation as well as manufacturing, and does it name cracks and leaks?
  4. Does the quote include delivery and the crane, and what is the fee outside the city?
  5. Who prepares the pit or base, and to what exact dimensions?
  6. What happens if the crane turns out not to reach on the day?
  7. Will you get an official tax invoice with VAT shown separately?

Ask us the same list. To learn more about who we are, see the why choose us and about us pages. For a longer list, use the tank buying checklist, and if you are new to the subject, start with the concrete water tank guide.

Ordering a precast tank anywhere in Saudi Arabia

The factory is in Riyadh, and we serve every region from it. Inside Riyadh, delivery and installation are free. In other cities there is a fee based on size and distance, written into your quote. So a tank for Jeddah, Dammam, Madinah or Najran comes from the same factory, in the same sizes, with the same warranty. The rest are listed under areas we serve.

The next step is easy. Send your location and photos of the spot and street on WhatsApp through our contact page, and tell us how many people the tank will serve. We reply with a written quote and a date. If you have other questions in the meantime, try the FAQ or start from the home page.

FAQ

Does a precast tank suit coastal cities and high humidity?
It is the same tank everywhere, with two waterproofing layers that deal with moisture and salts. If your site is near the sea or you hit water while digging, tell us before ordering so we can go through the installation with you.
What should I send you to get a quote?
Your map location, photos of the spot and the street, the number of people and the size if you have picked one. If you have not, we can help you work it out from the headcount. The quote is written and free.
Are "ready-made cement tank" and "precast tank" the same thing?
In everyday speech people usually mean the same idea a tank cast away from your site and delivered finished. Ours is reinforced concrete made in our factory and waterproofed inside and out. When comparing offers, ask about those details rather than the name.
Can a precast tank go underground and above ground?
Yes, both. It can sit in a pit below ground or above ground on a base. The choice depends on your space, ground conditions and where the water truck and pump will be.
How long from ordering to installation?
We give you a date when we reply to your request, based on your location and the size. The installation itself usually takes one day once the site is ready, so a prepared pit makes scheduling easier.
What if the crane cannot reach my site?
Send photos of the street and spot before ordering so we can assess access. Sometimes moving the tank to another part of the plot solves it. If there is really no way in, we will tell you straight before you commit.
Can I order precast tanks for more than one location?
Yes. Projects and multi-tank orders get a special quote, and we agree a schedule around when each site is ready. Outside Riyadh, delivery fees depend on size and distance.
Does the tank come waterproofed, or do I arrange that?
It arrives with both layers already on a water-safe chemical lining inside and bitumen outside. You do not need a separate waterproofing contractor for the tank itself.
Is a precast tank as strong as one cast on site?
Yes, often stronger, because casting and curing happen under controlled factory conditions with engineering supervision, and it carries a 10-year warranty.
What does the warranty cover?
A 10-year warranty on manufacturing and installation, covering cracks and leaks.
How long does installation take?
The tank arrives ready-made from the factory; crane installation usually takes one day once the site is prepared. We agree the delivery date when you order.

Ready to order your tank?

Message us on WhatsApp for a final delivered price to your city and an installation date.