Underground tanks

Underground Reinforced Concrete Water Tanks

Underground tanks are the most common choice for Saudi homes cooler water, no lost yard space, and decades of service when properly waterproofed.

Why an underground concrete tank?

  • Water stays cooler in summer because the soil insulates it.
  • It does not take up yard space or spoil the façade.
  • Reinforced concrete withstands soil pressure and loads above it.
  • Easy to fill from water trucks or the mains.

Waterproofing matters most underground

An underground tank is surrounded by soil, moisture and sometimes groundwater. Without external waterproofing, moisture and salts can enter or water can leak out. That is why every tank we make is bitumen-coated outside and chemically lined inside. Read more in our waterproofing guide.

What do you need before installation?

An excavation slightly larger than the tank, a level compacted base (or concrete slab), and crane access. Send us photos and we will advise. See our site preparation guide.

Recommended sizes

28m³
Buildings & farms

28 m³ Concrete Tank

Suits apartment buildings, large villas, farms and shops

  • Length4.35 m
  • Width3.35 m
  • Height2.90 m

Free quote including delivery to your city

Planning an underground concrete water tank, from choosing the spot to backfilling

Is an underground tank the right call for your property?

Burying a tank is a one-time decision. Once the pit is backfilled and the yard is tiled over, you are not going to move it. So before you book an excavator, it is worth checking three things whether there is a spot a crane can reach, whether you can dig there without undermining foundations, and whether you actually need the surface space back.

New builds are the easy case. The ground is still open, the fence may not be up yet, and digging does not damage any finishes, which is why underground is so common for villa water tanks planned early. Apartment buildings with a side setback and farms that want the tank out of the way of machinery also tend to suit it well.

There are cases where we would suggest looking at above-ground installation on a base instead. A finished house with a small, fully tiled yard is one. Hard rock that makes every metre of depth a major job is another. A site where you hit water almost as soon as you start digging is a third. The tank itself is the same either way, so you are choosing an installation method, not a different product. Our article on underground vs above-ground tanks walks through that choice in full.

Tank sizes for underground use footprint and depth

Capacity is what people ask about first, but for a buried tank two other numbers do more of the deciding. The footprint tells you where the pit can go. The height tells you how far down you have to dig.

SizeL × W × H (m)Footprint
14 m³3.55 × 2.30 × 2.808.2 m²
22 m³ long3.70 × 2.70 × 3.3010.0 m²
22 m³ square3.30 × 3.30 × 3.0010.9 m²
24 m³4.40 × 2.90 × 2.9012.8 m²
28 m³4.35 × 3.35 × 2.9014.6 m²
29 m³ long5.00 × 2.50 × 3.3012.5 m²
29 m³ wide4.40 × 2.90 × 3.3012.8 m²

A few useful patterns come out of this table. The 29 m³ wide tank has exactly the same footprint as the 24 m³ but stands 40 cm taller. If your yard is tight and the ground digs easily, that extra depth buys you 5,000 more litres without giving up any surface area.

Flip it around for rocky ground. The 28 m³ is only 2.90 m tall, so it gets close to our largest capacity with a shallower pit, as long as you can spare the 14.6 m² it needs. For a narrow strip along a boundary wall, the 29 m³ long is the slimmest of the large sizes at 2.50 m wide. For a squarish corner of a yard, the 22 m³ square usually sits better than the long version of the same capacity. You can compare all of them on the tanks page.

How long will each size last your household?

You only want to dig once, so size the tank for your real consumption rather than the smallest thing that might do. The rule is people × daily use × days. Here is what it looks like at 250 litres per person per day.

Capacity6 people8 people10 people
14 m³about 9 days7 daysabout 5.5 days
22 m³about 14.5 days11 daysabout 9 days
24 m³16 days12 daysabout 9.5 days
28 m³about 18.5 days14 daysabout 11 days
29 m³about 19 days14.5 daysabout 11.5 days

A household with a garden, a majlis that sees a lot of guests or several bathrooms in constant use may sit closer to 350 litres per person, which cuts these numbers noticeably. Plug your own figures into the tank size calculator, and read the size guide if you are torn between two options.

Think about how you fill it as well. If you rely on deliveries, a larger tank means ordering less often and taking a full load each time. Our water truck filling guide covers how to organise that.

Where to put the tank on your plot

People often pick whichever corner looks empty on the plan, then discover the crane cannot reach it or the delivery hose falls short. Run through this list before anyone starts digging.

  • Close enough to the street or gate for a water truck hose to reach the fill point.
  • A clear crane swing over the pit, with no power lines, canopies or high walls in the way.
  • As far from the septic pit and drain lines as the plot allows.
  • Not hard against the villa footings or a neighbour's wall. Deep digging next to foundations needs your site engineer's opinion.
  • Away from large trees and their root spread.
  • Not at the lowest point of the yard, where rain and wash water collect around the hatch.
  • Near the pump room, or near a spot where one can go, to keep pipe runs short.

Check your drawings for buried electric, water and drain lines too, because finding them with an excavator bucket is an expensive way to learn where they run. For layout ideas specific to houses, see where to place a tank at a villa.

Digging in different ground across Saudi Arabia

Ground conditions vary a lot across the Kingdom, and sometimes from one plot to the next. Treat these as patterns to watch for rather than a promise about your site.

Rock. Parts of Riyadh and mountain areas such as Abha and Taif can turn up rock that needs breaking equipment. A lower tank such as the 14, 24 or 28 m³ helps here, and so does leaving part of the tank above grade where the layout allows it. In the mountains, also look hard at the road in, since steep climbs and tight bends can matter more for a crane than the dig does.

Sand. Sandy plots are quick to excavate, but the sides can slump. Ask your excavation contractor to batter back or shore the sides, and do not let anyone climb into an unsupported pit. Time the dig close to installation day so wind and collapse do not undo the work. You may run into this on plots in Qassim, Hail or Al Kharj.

Coastal and high water table sites. In Jeddah, Dammam, Jubail, Jazan and parts of Al Ahsa, you may reach damp soil or standing water quickly. If that happens, stop, take photos and talk to us before going further. Our two waterproofing layers deal with moisture and salts around the tank, but keeping the pit dry long enough to install it is a separate problem that has to be planned.

Groundwater and the risk of an empty tank floating

This one rarely gets mentioned. An empty tank in the ground behaves a bit like a very heavy boat. If groundwater rises around it, the water pushes upward. A full tank does not have this problem, because the water inside holds it down. One cubic metre of water weighs about a tonne, so a full 28 m³ tank has roughly 28 tonnes of water keeping it in place.

If your site has shallow groundwater, or you simply are not sure, a few habits follow from that.

  • Tell us before you order, so we can talk through the site, size and installation approach.
  • Do not leave the tank empty for long after backfilling, especially when the water table is high.
  • When draining for cleaning, keep the empty period short and refill promptly.
  • Go by what your own pit shows, not by what people say about the neighbourhood.

Our article on tanks in high groundwater goes further into this. To see how the waterproofing and the 10-year warranty on cracks and leaks fit together, have a look at why customers choose us.

Installation day and backfilling, step by step

When the pit is ready and the access is clear, the work follows a simple order, and installation usually takes one day.

  1. Send your location and site photos on WhatsApp. We reply with a quote and a date.
  2. Prepare the pit and base to the dimensions we confirm, and check that the bottom is level.
  3. On the day, clear parked cars from the street and keep people away from the crane.
  4. The truck arrives and the crane lowers the tank. Before it settles, check that the inlet and outlet openings face your pipework.
  5. Connect the plumbing. The tank can be fed from the mains, a water truck or a well.
  6. Fill the tank and watch it before you backfill completely, while the sides are still visible.
  7. Backfill gradually and evenly on all sides, so the load does not come from one direction. Keep large stones and machinery from scraping the bitumen coat.

Our guide to truck and crane access explains what to arrange in the street beforehand, and tank plumbing connections covers the pipework in more detail.

Pumps, fill points and the things you only do once

Water does not climb out of the ground by itself. Every underground tank needs a pump, either to lift water to a roof tank or to push it straight into the house. Plan the pump location at the same time as the pit, not after the yard is finished.

Choose somewhere dry and ventilated with a drain route for the odd leak, and leave enough room for a technician to work. A single-storey house and a multi-floor building call for different pumps, so read the tank pump guide before buying. On apartment buildings the same logic applies with more demand and more head to overcome.

Keep the fill point somewhere a truck hose can reach without crossing a seating area or parked cars. Raise the hatch rim above the surrounding ground so wash water and dust stay out. That small detail does a lot for keeping tank water clean, and it also makes the job easier when you follow our tank cleaning guide.

Common mistakes with underground tanks

Most trouble with buried tanks comes from decisions made around the tank rather than from the tank itself.

  • Digging before choosing the size. Reworking a pit costs time. Pick the tank and get the dimensions first.
  • Forgetting the crane. A perfect pit behind a high wall is no use if the crane cannot reach over it.
  • An uneven pit floor. The tank needs a level, compacted surface so its weight spreads properly.
  • Adding heavy loads later. If you plan parking or a driveway above the tank, raise it before ordering rather than after.
  • Burying the hatch. Keep the opening visible and reachable for inspection and cleaning.
  • Ignoring signs of a leak. A falling water level with no use, or damp ground around the tank, deserves a look. Start with how to detect a tank leak and then call us.

Our tank buying checklist puts all this in one list you can go through with your excavation contractor.

Ordering from anywhere in the Kingdom

We cast our tanks at our factory in Al Suwaidi, Riyadh, and deliver to all regions. Delivery and installation are free inside Riyadh. Elsewhere there is a fee based on tank size and distance, shown in your quote before you commit. Check the areas we serve for your city.

You will get a faster answer if you contact us with your map location, a photo of the spot, a photo of the street, the number of people the tank will serve and anything you have noticed in the ground. We reply with a free written quote showing VAT separately, plus a date, and you receive an official tax invoice. More general questions are answered on our FAQ page.

FAQ

Can part of the tank stay above ground?
Yes, and it is a practical answer on rock or where groundwater is close. You dig less and part of the tank stands proud of the yard, which you can then screen or build a seating area around once we have agreed the details.
Do I still need a roof tank with an underground tank?
That depends on how your house is plumbed. Some homes pump up to a roof tank and others pressurise the pipes directly. Decide before buying the pump, because each setup is sized differently.
Do you dig the pit, or do I arrange that?
Preparing the site, including the excavation, is on your side before installation day. We give you the tank dimensions and can review photos of the pit so everything is ready when the truck arrives.
Can I park cars over an underground tank?
Tell us before you order rather than assuming. Reinforced concrete handles soil pressure and loads above it, but we want to know exactly what will sit on top so we can advise you properly alongside your site engineer.
Can a tank be installed at a house we already live in?
Yes, if there is ground that can be dug and a route for the crane. You may need to lift some tiling and reinstate it after backfilling. If the yard is very tight, above-ground installation may suit you better.
Can I connect two underground tanks together?
Yes. Several tanks can be installed and connected, which is practical when you have no room for one large tank or need more than 29 m³. Multiple tanks get a special quote.
How do I check a buried tank for leaks?
Stop filling and drawing water for a while and watch the level. If it drops without use, or the ground around the tank turns damp, have it looked at. Our warranty covers cracks and leaks for 10 years.
How do I make sure the openings line up with my pipes?
Send us your pump location and where the water truck will park before installation day. When the crane lowers the tank we pay attention to which way the inlet and outlet face so they suit your pipe route.
How deep should the pit be?
It depends on the tank height you choose (2.80 to 3.30 m) and your ground level. We give you exact dimensions before excavation.
Is an underground tank affected by groundwater?
Not with external bitumen waterproofing, which is standard on all our tanks.
What does the warranty cover?
A 10-year warranty on manufacturing and installation, covering cracks and leaks.
How long does installation take?
The tank arrives ready-made from the factory; crane installation usually takes one day once the site is prepared. We agree the delivery date when you order.